Foundation to Build a Custom House Plan

RSS

With the original house cleared, the construction of the two story house plan in Timbergrove is now moving at a steady clip.  Two weeks ago the formwork for the foundation was erected and digging for the grade beams was completed.

Picture-007 Picture-009 Picture-010 PWA_7-27-1 PWA_7-27-2

Once the piers were drilled, the steel beams for the cantilever were erected. A residential designer loves a cantilever because they get to use them so rarely in their designs. This custom house plan definitely called for a cantilever to take advantage of the vista over the ravine. The next step will be to erect the framing for the first floor of the house!